Dashboard
Tenders & quotes
Clients & sites
Projects
Daily drill reports
Rig app
Rig schedule
Plant & rigs
Equipment hire
Inventory
Purchasing
Crew & tickets
Timesheets & payroll
Safety
Invoices
Reports
Settings
AD
☰
AD
Rig app — R213
KP-26-039 · Peabody Energy Australia · Wambo Coal — South Bates
Xero · synced 09:14
Demo
09 Oct 2026
⌘K
5
Take the tour
‹
R213
Daily drill report
09 Oct 2026
Peabody Energy — Goaf drainage holes — South Bates LW 21
KP-26-039 · Large diameter 311 mm · client rep Glen Hutchins
Last report: 8 Oct day · WSB003 212.3→258.2 m ·
Submitted
Date
Shift
Day
Night
Hole
WSB003 — 258.2 of 290 m (Drilling)
WSB004 — 0 of 290 m (Planned)
From (m)
To (m)
Drilled this shift
31.8 m
Drilling (h)
Standby (h)
Rig move (h)
Maintenance (h)
Standby reason
—
Waiting on water cart
Site-wide stop — lightning within 10 km
Client hold — geologist logging
Blast clearance — pit closed
Waiting on survey crew
Site access — permit to dig
Wet weather — pad unsafe
Gas reading above trigger — hold
Water cart (h)
Shift total
12.0 h
Consumables used
BIT-TRI-311
Tricone bit 311 mm
ea
FUEL
Diesel — bulk
L
MUD-FOAM
Drilling foam 20 L
drum
MUD-GREASE
Rod grease 20 kg
pail
MUD-PHPA
PHPA liquid polymer 20 L
drum
HOSE-HYD
Hydraulic hose assembly (assorted)
ea
Crew on shift
Dean Mackay
Driller · 12 h
Mitch O'Brien
Offsider · 12 h
Notes
Good ground. Core recovery 98%.
Client rep sign-off
Signed on the phone by the client representative at end of shift.
Submit to office
AD
Aaron Donohue
aaron.donohue@kerembla.com.au
My profile
Account settings
Sent items
Take the guided tour
▤
Sidebar
▪
Icon rail
▬
Top bar
Sign out
Notifications
Mark all read
All notifications