Dashboard
Tenders & quotes
Clients & sites
Projects
Daily drill reports
Rig app
Rig schedule
Plant & rigs
Equipment hire
Inventory
Purchasing
Crew & tickets
Timesheets & payroll
Safety
Invoices
Reports
Settings
AD
☰
AD
Rig app — R216
KP-26-034 · Glencore Coal Assets Australia · Mangoola Coal
Xero · synced 09:14
Demo
09 Oct 2026
⌘K
5
Take the tour
‹
R216
Daily drill report
09 Oct 2026
Glencore Coal Assets — Groundwater monitoring bores — NW modification
KP-26-034 · Rotary mud — monitoring bore · client rep Andrew Kempe
Last report: 8 Oct day · MGO003 25→86.4 m ·
Submitted
Date
Shift
Day
Night
Hole
MGO003 — 86.4 of 90 m (Drilling)
MGO004 — 0 of 90 m (Planned)
MGO005 — 0 of 90 m (Planned)
MGO006 — 0 of 90 m (Planned)
MGO007 — 0 of 90 m (Planned)
MGO008 — 0 of 90 m (Planned)
MGO009 — 0 of 90 m (Planned)
MGO010 — 0 of 90 m (Planned)
From (m)
To (m)
Drilled this shift
3.6 m
Drilling (h)
Standby (h)
Rig move (h)
Maintenance (h)
Standby reason
—
Waiting on water cart
Site-wide stop — lightning within 10 km
Client hold — geologist logging
Blast clearance — pit closed
Waiting on survey crew
Site access — permit to dig
Wet weather — pad unsafe
Gas reading above trigger — hold
Water cart (h)
Shift total
12.0 h
Consumables used
BENT
Bentonite chips 20 kg
bag
CAS-PVC
50 mm PVC class 18 casing / screen
m
GRAVEL
Gravel pack 20 kg
bag
GROUT
Cement GP 20 kg
bag
FUEL
Diesel — bulk
L
MUD-BENT
Bentonite 25 kg
bag
MUD-GREASE
Rod grease 20 kg
pail
MUD-PAC
PAC-L polymer 25 kg
bag
HOSE-HYD
Hydraulic hose assembly (assorted)
ea
Crew on shift
Mick Fahey
Driller · 12 h
Notes
Good ground. Core recovery 98%.
Client rep sign-off
Signed on the phone by the client representative at end of shift.
Submit to office
AD
Aaron Donohue
aaron.donohue@kerembla.com.au
My profile
Account settings
Sent items
Take the guided tour
▤
Sidebar
▪
Icon rail
▬
Top bar
Sign out
Notifications
Mark all read
All notifications