| DDR-24366 | 7 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2628 | 0 → 55.2 | 55.2 | 11.5 / 0 | $10,246 | Approved | |
| DDR-24367 | 7 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2628 | 55.2 → 85.1 | 29.9 | 11 / 0 | $5,601 | Approved | |
| DDR-24365 | 7 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2619 | 182.1 → 235.9 | 53.8 | 11.5 / 0 | $9,842 | Approved | |
| DDR-24355 | 6 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 260.6 → 310.5 | 49.9 | 11.5 / 0 | $9,354 | Approved | |
| DDR-24356 | 6 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 310.5 → 331 | 20.5 | 9 / 2.5 | $5,550 | Approved | |
| DDR-24354 | 6 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2619 | 131.2 → 182.1 | 50.9 | 11 / 0 | $9,067 | Approved | |
| DDR-24344 | 5 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 186.1 → 230 | 43.9 | 11.5 / 0 | $8,018 | Approved | |
| DDR-24345 | 5 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 230 → 260.6 | 30.6 | 11.5 / 0 | $5,721 | Approved | |
| DDR-24343 | 5 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2619 | 84.9 → 131.2 | 46.3 | 11.5 / 0 | $8,250 | Approved | |
| DDR-24333 | 4 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 95 → 141.3 | 46.3 | 11 / 0 | $8,526 | Approved · invoiced | |
| DDR-24334 | 4 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 141.3 → 186.1 | 44.8 | 11.5 / 0 | $8,311 | Approved · invoiced | |
| DDR-24332 | 4 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2619 | 43.7 → 84.9 | 41.2 | 11 / 0 | $7,760 | Approved · invoiced | |
| DDR-24327 | 3 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 0 → 44.1 | 44.1 | 11 / 0 | $8,259 | Approved · invoiced | |
| DDR-24328 | 3 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2626 | 44.1 → 95 | 50.9 | 11.5 / 0 | $9,412 | Approved · invoiced | |
| DDR-24326 | 3 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2619 | 0 → 43.7 | 43.7 | 11.5 / 0 | $7,776 | Approved · invoiced | |
| DDR-24316 | 2 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 353.2 → 396.8 | 43.6 | 9 / 2.5 | $10,069 | Approved · invoiced | |
| DDR-24317 | 2 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 396.8 → 398 | 1.2 | 6.5 / 0 | $2,687 | Approved · invoiced | |
| DDR-24315 | 2 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 371.6 → 374 | 2.4 | 6.5 / 0 | $2,853 | Approved · invoiced | |
| DDR-24305 | 1 Oct day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 256 → 308.1 | 52.1 | 11.5 / 0 | $9,813 | Approved · invoiced | |
| DDR-24306 | 1 Oct night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 308.1 → 353.2 | 45.1 | 11.5 / 0 | $9,402 | Approved · invoiced | |
| DDR-24304 | 1 Oct day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 341.4 → 371.6 | 30.2 | 11.5 / 0 | $6,377 | Approved · invoiced | |
| DDR-24294 | 30 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 147.6 → 203 | 55.4 | 11.5 / 0 | $10,143 | Approved · invoiced | |
| DDR-24295 | 30 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 203 → 256 | 53.0 | 11 / 0 | $9,428 | Approved · invoiced | |
| DDR-24293 | 30 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 297.3 → 341.4 | 44.1 | 11.5 / 0 | $9,115 | Approved · invoiced | |
| DDR-24283 | 29 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 45.9 → 95.6 | 49.7 | 11.5 / 0 | $9,136 | Approved · invoiced | |
| DDR-24284 | 29 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 95.6 → 147.6 | 52.0 | 11.5 / 0 | $9,463 | Approved · invoiced | |
| DDR-24282 | 29 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 258.8 → 297.3 | 38.5 | 10.5 / 1 | $7,665 | Approved · invoiced | |
| DDR-24272 | 28 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 355.6 → 388 | 32.4 | 11 / 0 | $6,558 | Approved · invoiced | |
| DDR-24273 | 28 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2624 | 0 → 45.9 | 45.9 | 11.5 / 0 | $8,181 | Approved · invoiced | |
| DDR-24271 | 28 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 212.1 → 258.8 | 46.7 | 9.5 / 1.5 | $9,325 | Approved · invoiced | |
| DDR-24262 | 27 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 280.5 → 318.7 | 38.2 | 11.5 / 0 | $7,598 | Approved · invoiced | |
| DDR-24263 | 27 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 318.7 → 355.6 | 36.9 | 11.5 / 0 | $7,811 | Approved · invoiced | |
| DDR-24261 | 27 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 167.9 → 212.1 | 44.2 | 11 / 0 | $8,138 | Approved · invoiced | |
| DDR-24256 | 26 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 171.1 → 226.8 | 55.7 | 11.5 / 0 | $10,263 | Approved · invoiced | |
| DDR-24257 | 26 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 226.8 → 280.5 | 53.7 | 11 / 0 | $9,824 | Approved · invoiced | |
| DDR-24255 | 26 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 117.4 → 167.9 | 50.5 | 11.5 / 0 | $9,412 | Approved · invoiced | |
| DDR-24246 | 25 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 99 → 135.7 | 36.7 | 8 / 3 | $7,938 | Approved · invoiced | |
| DDR-24247 | 25 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 135.7 → 171.1 | 35.4 | 11 / 0 | $6,573 | Approved · invoiced | |
| DDR-24245 | 25 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 73.5 → 117.4 | 43.9 | 11.5 / 0 | $8,225 | Approved · invoiced | |
| DDR-24236 | 24 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 30.4 → 66.3 | 35.9 | 11.5 / 0 | $6,797 | Approved · invoiced | |
| DDR-24237 | 24 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 66.3 → 99 | 32.7 | 11.5 / 0 | $6,246 | Approved · invoiced | |
| DDR-24235 | 24 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 38.6 → 73.5 | 34.9 | 11 / 0 | $6,625 | Approved · invoiced | |
| DDR-24225 | 23 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 294.6 → 340 | 45.4 | 11.5 / 0 | $9,331 | Approved · invoiced | |
| DDR-24226 | 23 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2622 | 0 → 30.4 | 30.4 | 11.5 / 0 | $5,687 | Approved · invoiced | |
| DDR-24224 | 23 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2617 | 0 → 38.6 | 38.6 | 8 / 3 | $8,334 | Approved · invoiced | |
| DDR-24214 | 22 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 229.3 → 257.6 | 28.3 | 8.5 / 3 | $6,235 | Approved · invoiced | |
| DDR-24215 | 22 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 257.6 → 294.6 | 37.0 | 11 / 0 | $6,805 | Approved · invoiced | |
| DDR-24213 | 22 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 326.7 → 337 | 10.3 | 11.5 / 0 | $2,442 | Approved · invoiced | |
| DDR-24203 | 21 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 147.1 → 174.8 | 27.7 | 11 / 0 | $5,153 | Approved · invoiced | |
| DDR-24204 | 21 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 174.8 → 229.3 | 54.5 | 11.5 / 0 | $9,919 | Approved · invoiced | |
| DDR-24202 | 21 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 296.2 → 326.7 | 30.5 | 9.5 / 1.5 | $7,006 | Approved · invoiced | |
| DDR-24192 | 20 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 67.3 → 106.9 | 39.6 | 11.5 / 0 | $7,045 | Approved · invoiced | |
| DDR-24193 | 20 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 106.9 → 147.1 | 40.2 | 8.5 / 3 | $8,540 | Approved · invoiced | |
| DDR-24191 | 20 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 274.3 → 296.2 | 21.9 | 7.5 / 4 | $5,891 | Approved · invoiced | |
| DDR-24186 | 19 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 0 → 38.8 | 38.8 | 11.5 / 0 | $7,115 | Approved · invoiced | |
| DDR-24187 | 19 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2620 | 38.8 → 67.3 | 28.5 | 10 / 1.5 | $5,884 | Approved · invoiced | |
| DDR-24185 | 19 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 247.3 → 274.3 | 27.0 | 10 / 1.5 | $5,393 | Approved · invoiced | |
| DDR-24177 | 18 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 324.7 → 369.2 | 44.5 | 11.5 / 0 | $9,189 | Approved · invoiced | |
| DDR-24178 | 18 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 369.2 → 397 | 27.8 | 11.5 / 0 | $5,838 | Approved · invoiced | |
| DDR-24176 | 18 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 190.6 → 247.3 | 56.7 | 11.5 / 0 | $10,297 | Approved · invoiced | |
| DDR-24168 | 17 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 253.6 → 285.5 | 31.9 | 7.5 / 4 | $7,620 | Approved · invoiced | |
| DDR-24169 | 17 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 285.5 → 324.7 | 39.2 | 11.5 / 0 | $7,914 | Approved · invoiced | |
| DDR-24167 | 17 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 150.7 → 190.6 | 39.9 | 11.5 / 0 | $7,511 | Approved · invoiced | |
| DDR-24159 | 16 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 193.3 → 226.7 | 33.4 | 7.5 / 4 | $7,947 | Approved · invoiced | |
| DDR-24160 | 16 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 226.7 → 253.6 | 26.9 | 8.5 / 2.5 | $6,184 | Approved · invoiced | |
| DDR-24158 | 16 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 95.7 → 150.7 | 55.0 | 11.5 / 0 | $10,212 | Approved · invoiced | |
| DDR-24150 | 15 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 106.1 → 138 | 31.9 | 11.5 / 0 | $6,109 | Approved · invoiced | |
| DDR-24151 | 15 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 138 → 193.3 | 55.3 | 11.5 / 0 | $10,057 | Approved · invoiced | |
| DDR-24149 | 15 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 63.1 → 95.7 | 32.6 | 11.5 / 0 | $6,022 | Approved · invoiced | |
| DDR-24141 | 14 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 0 → 52.5 | 52.5 | 11 / 0 | $9,618 | Approved · invoiced | |
| DDR-24142 | 14 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2618 | 52.5 → 106.1 | 53.6 | 11 / 0 | $9,531 | Approved · invoiced | |
| DDR-24140 | 14 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 28.9 → 63.1 | 34.2 | 11.5 / 0 | $6,504 | Approved · invoiced | |
| DDR-24132 | 13 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 281.8 → 331.1 | 49.3 | 11.5 / 0 | $9,788 | Approved · invoiced | |
| DDR-24133 | 13 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 331.1 → 350 | 18.9 | 11.5 / 0 | $4,248 | Approved · invoiced | |
| DDR-24131 | 13 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2615 | 0 → 28.9 | 28.9 | 11 / 0 | $5,429 | Approved · invoiced | |
| DDR-24128 | 12 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 203.8 → 252.3 | 48.5 | 11.5 / 0 | $8,904 | Approved · invoiced | |
| DDR-24129 | 12 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 252.3 → 281.8 | 29.5 | 11.5 / 0 | $5,601 | Approved · invoiced | |
| DDR-24127 | 12 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 339.2 → 345 | 5.8 | 6 / 0 | $3,753 | Approved · invoiced | |
| DDR-24122 | 11 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 138.1 → 167.8 | 29.7 | 11.5 / 0 | $5,290 | Approved · invoiced | |
| DDR-24123 | 11 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 167.8 → 203.8 | 36.0 | 11 / 0 | $6,400 | Approved · invoiced | |
| DDR-24121 | 11 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 305 → 339.2 | 34.2 | 11 / 0 | $7,118 | Approved · invoiced | |
| DDR-24116 | 10 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 76.2 → 111 | 34.8 | 11 / 0 | $6,539 | Approved · invoiced | |
| DDR-24117 | 10 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 111 → 138.1 | 27.1 | 10 / 1.5 | $5,436 | Approved · invoiced | |
| DDR-24115 | 10 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 259 → 305 | 46.0 | 11 / 0 | $8,594 | Approved · invoiced | |
| DDR-24110 | 9 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 0 → 28.2 | 28.2 | 11 / 0 | $5,377 | Approved · invoiced | |
| DDR-24111 | 9 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2616 | 28.2 → 76.2 | 48.0 | 11 / 0 | $8,956 | Approved · invoiced | |
| DDR-24109 | 9 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 220.5 → 259 | 38.5 | 8.5 / 2.5 | $8,120 | Approved · invoiced | |
| DDR-24104 | 8 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 314.7 → 353.7 | 39.0 | 11.5 / 0 | $8,085 | Approved · invoiced | |
| DDR-24105 | 8 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 353.7 → 383 | 29.3 | 11.5 / 0 | $6,339 | Approved · invoiced | |
| DDR-24103 | 8 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 169.9 → 220.5 | 50.6 | 11.5 / 0 | $9,015 | Approved · invoiced | |
| DDR-24098 | 7 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 218.4 → 257.9 | 39.5 | 11.5 / 0 | $7,304 | Approved · invoiced | |
| DDR-24099 | 7 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 257.9 → 314.7 | 56.8 | 11.5 / 0 | $10,805 | Approved · invoiced | |
| DDR-24097 | 7 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 144.9 → 169.9 | 25.0 | 8 / 3 | $5,848 | Approved · invoiced | |
| DDR-24093 | 6 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 143.7 → 172.7 | 29.0 | 11.5 / 0 | $5,377 | Approved · invoiced | |
| DDR-24094 | 6 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 172.7 → 218.4 | 45.7 | 11 / 0 | $8,422 | Approved · invoiced | |
| DDR-24092 | 6 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 96.9 → 144.9 | 48.0 | 11 / 0 | $8,542 | Approved · invoiced | |
| DDR-24089 | 5 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 55.2 → 103.1 | 47.9 | 11.5 / 0 | $8,525 | Approved · invoiced | |
| DDR-24090 | 5 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 103.1 → 143.7 | 40.6 | 9.5 / 1.5 | $8,181 | Approved · invoiced | |
| DDR-24088 | 5 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 63.7 → 96.9 | 33.2 | 11 / 0 | $6,332 | Approved · invoiced | |
| DDR-24084 | 4 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 326.2 → 339 | 12.8 | 11.5 / 0 | $2,794 | Approved · invoiced | |
| DDR-24085 | 4 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2614 | 0 → 55.2 | 55.2 | 11.5 / 0 | $10,246 | Approved · invoiced | |
| DDR-24083 | 4 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 35.3 → 63.7 | 28.4 | 11 / 0 | $5,067 | Approved · invoiced | |
| DDR-24079 | 3 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 260.9 → 295.5 | 34.6 | 11.5 / 0 | $6,504 | Approved · invoiced | |
| DDR-24080 | 3 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 295.5 → 326.2 | 30.7 | 11.5 / 0 | $6,436 | Approved · invoiced | |
| DDR-24078 | 3 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2613 | 0 → 35.3 | 35.3 | 11 / 0 | $6,487 | Approved · invoiced | |
| DDR-24074 | 2 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 180.3 → 232.4 | 52.1 | 11.5 / 0 | $9,273 | Approved · invoiced | |
| DDR-24075 | 2 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 232.4 → 260.9 | 28.5 | 11 / 0 | $5,084 | Approved · invoiced | |
| DDR-24073 | 2 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 312.5 → 331 | 18.5 | 11.5 / 0 | $4,101 | Approved · invoiced | |
| DDR-24069 | 1 Sep day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 115.6 → 147.8 | 32.2 | 11 / 0 | $5,746 | Approved · invoiced | |
| DDR-24070 | 1 Sep night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 147.8 → 180.3 | 32.5 | 9 / 2.5 | $6,786 | Approved · invoiced | |
| DDR-24068 | 1 Sep day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 272.7 → 312.5 | 39.8 | 11.5 / 0 | $7,794 | Approved · invoiced | |
| DDR-24064 | 31 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 53.6 → 85.1 | 31.5 | 11 / 0 | $5,600 | Approved · invoiced | |
| DDR-24065 | 31 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 85.1 → 115.6 | 30.5 | 8.5 / 2.5 | $6,692 | Approved · invoiced | |
| DDR-24063 | 31 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 226.7 → 272.7 | 46.0 | 11 / 0 | $8,612 | Approved · invoiced | |
| DDR-24061 | 30 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 362.9 → 397 | 34.1 | 11.5 / 0 | $7,237 | Approved · invoiced | |
| DDR-24062 | 30 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2612 | 0 → 53.6 | 53.6 | 11.5 / 0 | $9,807 | Approved · invoiced | |
| DDR-24060 | 30 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 190.6 → 226.7 | 36.1 | 11.5 / 0 | $6,788 | Approved · invoiced | |
| DDR-24058 | 29 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 295.3 → 332.2 | 36.9 | 11.5 / 0 | $7,768 | Approved · invoiced | |
| DDR-24059 | 29 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 332.2 → 362.9 | 30.7 | 11 / 0 | $6,475 | Approved · invoiced | |
| DDR-24057 | 29 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 140.7 → 190.6 | 49.9 | 11.5 / 0 | $9,102 | Approved · invoiced | |
| DDR-24055 | 28 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 242.7 → 275.1 | 32.4 | 11.5 / 0 | $5,988 | Approved · invoiced | |
| DDR-24056 | 28 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 275.1 → 295.3 | 20.2 | 7.5 / 4 | $5,529 | Approved · invoiced | |
| DDR-24054 | 28 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 108.6 → 140.7 | 32.1 | 11.5 / 0 | $5,729 | Approved · invoiced | |
| DDR-24052 | 27 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 147 → 194.5 | 47.5 | 11 / 0 | $8,732 | Approved · invoiced | |
| DDR-24053 | 27 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 194.5 → 242.7 | 48.2 | 11.5 / 0 | $8,990 | Approved · invoiced | |
| DDR-24051 | 27 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 65 → 108.6 | 43.6 | 11.5 / 0 | $8,104 | Approved · invoiced | |
| DDR-24049 | 26 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 63 → 119.7 | 56.7 | 11.5 / 0 | $10,366 | Approved · invoiced | |
| DDR-24050 | 26 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 119.7 → 147 | 27.3 | 11 / 0 | $4,878 | Approved · invoiced | |
| DDR-24048 | 26 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 11.3 → 65 | 53.7 | 11.5 / 0 | $9,893 | Approved · invoiced | |
| DDR-24046 | 25 Aug day | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 0 → 27.1 | 27.1 | 5.5 / 0 | $7,699 | Approved · invoiced | |
| DDR-24047 | 25 Aug night | R204 | KP-26-031 BHP Mt Arthur Coal | MTA2610 | 27.1 → 63 | 35.9 | 8.5 / 2.5 | $7,715 | Approved · invoiced | |
| DDR-24045 | 25 Aug day | R205 | KP-26-031 BHP Mt Arthur Coal | MTA2611 | 0 → 11.3 | 11.3 | 3.5 / 2 | $5,392 | Approved · invoiced | |