ReportShiftRigProjectHoleFrom → toMetresDrill / stby hValueStatus
DDR-24366 7 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2628 0 → 55.2 55.2 11.5 / 0 $10,246 Approved
DDR-24367 7 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2628 55.2 → 85.1 29.9 11 / 0 $5,601 Approved
DDR-24365 7 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2619 182.1 → 235.9 53.8 11.5 / 0 $9,842 Approved
DDR-24355 6 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2626 260.6 → 310.5 49.9 11.5 / 0 $9,354 Approved
DDR-24356 6 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2626 310.5 → 331 20.5 9 / 2.5 $5,550 Approved
DDR-24354 6 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2619 131.2 → 182.1 50.9 11 / 0 $9,067 Approved
DDR-24344 5 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2626 186.1 → 230 43.9 11.5 / 0 $8,018 Approved
DDR-24345 5 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2626 230 → 260.6 30.6 11.5 / 0 $5,721 Approved
DDR-24343 5 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2619 84.9 → 131.2 46.3 11.5 / 0 $8,250 Approved
DDR-24333 4 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2626 95 → 141.3 46.3 11 / 0 $8,526 Approved · invoiced
DDR-24334 4 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2626 141.3 → 186.1 44.8 11.5 / 0 $8,311 Approved · invoiced
DDR-24332 4 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2619 43.7 → 84.9 41.2 11 / 0 $7,760 Approved · invoiced
DDR-24327 3 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2626 0 → 44.1 44.1 11 / 0 $8,259 Approved · invoiced
DDR-24328 3 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2626 44.1 → 95 50.9 11.5 / 0 $9,412 Approved · invoiced
DDR-24326 3 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2619 0 → 43.7 43.7 11.5 / 0 $7,776 Approved · invoiced
DDR-24316 2 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2624 353.2 → 396.8 43.6 9 / 2.5 $10,069 Approved · invoiced
DDR-24317 2 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2624 396.8 → 398 1.2 6.5 / 0 $2,687 Approved · invoiced
DDR-24315 2 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 371.6 → 374 2.4 6.5 / 0 $2,853 Approved · invoiced
DDR-24305 1 Oct day R204 KP-26-031 BHP Mt Arthur Coal MTA2624 256 → 308.1 52.1 11.5 / 0 $9,813 Approved · invoiced
DDR-24306 1 Oct night R204 KP-26-031 BHP Mt Arthur Coal MTA2624 308.1 → 353.2 45.1 11.5 / 0 $9,402 Approved · invoiced
DDR-24304 1 Oct day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 341.4 → 371.6 30.2 11.5 / 0 $6,377 Approved · invoiced
DDR-24294 30 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2624 147.6 → 203 55.4 11.5 / 0 $10,143 Approved · invoiced
DDR-24295 30 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2624 203 → 256 53.0 11 / 0 $9,428 Approved · invoiced
DDR-24293 30 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 297.3 → 341.4 44.1 11.5 / 0 $9,115 Approved · invoiced
DDR-24283 29 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2624 45.9 → 95.6 49.7 11.5 / 0 $9,136 Approved · invoiced
DDR-24284 29 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2624 95.6 → 147.6 52.0 11.5 / 0 $9,463 Approved · invoiced
DDR-24282 29 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 258.8 → 297.3 38.5 10.5 / 1 $7,665 Approved · invoiced
DDR-24272 28 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2622 355.6 → 388 32.4 11 / 0 $6,558 Approved · invoiced
DDR-24273 28 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2624 0 → 45.9 45.9 11.5 / 0 $8,181 Approved · invoiced
DDR-24271 28 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 212.1 → 258.8 46.7 9.5 / 1.5 $9,325 Approved · invoiced
DDR-24262 27 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2622 280.5 → 318.7 38.2 11.5 / 0 $7,598 Approved · invoiced
DDR-24263 27 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2622 318.7 → 355.6 36.9 11.5 / 0 $7,811 Approved · invoiced
DDR-24261 27 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 167.9 → 212.1 44.2 11 / 0 $8,138 Approved · invoiced
DDR-24256 26 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2622 171.1 → 226.8 55.7 11.5 / 0 $10,263 Approved · invoiced
DDR-24257 26 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2622 226.8 → 280.5 53.7 11 / 0 $9,824 Approved · invoiced
DDR-24255 26 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 117.4 → 167.9 50.5 11.5 / 0 $9,412 Approved · invoiced
DDR-24246 25 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2622 99 → 135.7 36.7 8 / 3 $7,938 Approved · invoiced
DDR-24247 25 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2622 135.7 → 171.1 35.4 11 / 0 $6,573 Approved · invoiced
DDR-24245 25 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 73.5 → 117.4 43.9 11.5 / 0 $8,225 Approved · invoiced
DDR-24236 24 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2622 30.4 → 66.3 35.9 11.5 / 0 $6,797 Approved · invoiced
DDR-24237 24 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2622 66.3 → 99 32.7 11.5 / 0 $6,246 Approved · invoiced
DDR-24235 24 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 38.6 → 73.5 34.9 11 / 0 $6,625 Approved · invoiced
DDR-24225 23 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2620 294.6 → 340 45.4 11.5 / 0 $9,331 Approved · invoiced
DDR-24226 23 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2622 0 → 30.4 30.4 11.5 / 0 $5,687 Approved · invoiced
DDR-24224 23 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2617 0 → 38.6 38.6 8 / 3 $8,334 Approved · invoiced
DDR-24214 22 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2620 229.3 → 257.6 28.3 8.5 / 3 $6,235 Approved · invoiced
DDR-24215 22 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2620 257.6 → 294.6 37.0 11 / 0 $6,805 Approved · invoiced
DDR-24213 22 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 326.7 → 337 10.3 11.5 / 0 $2,442 Approved · invoiced
DDR-24203 21 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2620 147.1 → 174.8 27.7 11 / 0 $5,153 Approved · invoiced
DDR-24204 21 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2620 174.8 → 229.3 54.5 11.5 / 0 $9,919 Approved · invoiced
DDR-24202 21 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 296.2 → 326.7 30.5 9.5 / 1.5 $7,006 Approved · invoiced
DDR-24192 20 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2620 67.3 → 106.9 39.6 11.5 / 0 $7,045 Approved · invoiced
DDR-24193 20 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2620 106.9 → 147.1 40.2 8.5 / 3 $8,540 Approved · invoiced
DDR-24191 20 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 274.3 → 296.2 21.9 7.5 / 4 $5,891 Approved · invoiced
DDR-24186 19 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2620 0 → 38.8 38.8 11.5 / 0 $7,115 Approved · invoiced
DDR-24187 19 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2620 38.8 → 67.3 28.5 10 / 1.5 $5,884 Approved · invoiced
DDR-24185 19 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 247.3 → 274.3 27.0 10 / 1.5 $5,393 Approved · invoiced
DDR-24177 18 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2618 324.7 → 369.2 44.5 11.5 / 0 $9,189 Approved · invoiced
DDR-24178 18 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2618 369.2 → 397 27.8 11.5 / 0 $5,838 Approved · invoiced
DDR-24176 18 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 190.6 → 247.3 56.7 11.5 / 0 $10,297 Approved · invoiced
DDR-24168 17 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2618 253.6 → 285.5 31.9 7.5 / 4 $7,620 Approved · invoiced
DDR-24169 17 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2618 285.5 → 324.7 39.2 11.5 / 0 $7,914 Approved · invoiced
DDR-24167 17 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 150.7 → 190.6 39.9 11.5 / 0 $7,511 Approved · invoiced
DDR-24159 16 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2618 193.3 → 226.7 33.4 7.5 / 4 $7,947 Approved · invoiced
DDR-24160 16 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2618 226.7 → 253.6 26.9 8.5 / 2.5 $6,184 Approved · invoiced
DDR-24158 16 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 95.7 → 150.7 55.0 11.5 / 0 $10,212 Approved · invoiced
DDR-24150 15 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2618 106.1 → 138 31.9 11.5 / 0 $6,109 Approved · invoiced
DDR-24151 15 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2618 138 → 193.3 55.3 11.5 / 0 $10,057 Approved · invoiced
DDR-24149 15 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 63.1 → 95.7 32.6 11.5 / 0 $6,022 Approved · invoiced
DDR-24141 14 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2618 0 → 52.5 52.5 11 / 0 $9,618 Approved · invoiced
DDR-24142 14 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2618 52.5 → 106.1 53.6 11 / 0 $9,531 Approved · invoiced
DDR-24140 14 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 28.9 → 63.1 34.2 11.5 / 0 $6,504 Approved · invoiced
DDR-24132 13 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2616 281.8 → 331.1 49.3 11.5 / 0 $9,788 Approved · invoiced
DDR-24133 13 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2616 331.1 → 350 18.9 11.5 / 0 $4,248 Approved · invoiced
DDR-24131 13 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2615 0 → 28.9 28.9 11 / 0 $5,429 Approved · invoiced
DDR-24128 12 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2616 203.8 → 252.3 48.5 11.5 / 0 $8,904 Approved · invoiced
DDR-24129 12 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2616 252.3 → 281.8 29.5 11.5 / 0 $5,601 Approved · invoiced
DDR-24127 12 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 339.2 → 345 5.8 6 / 0 $3,753 Approved · invoiced
DDR-24122 11 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2616 138.1 → 167.8 29.7 11.5 / 0 $5,290 Approved · invoiced
DDR-24123 11 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2616 167.8 → 203.8 36.0 11 / 0 $6,400 Approved · invoiced
DDR-24121 11 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 305 → 339.2 34.2 11 / 0 $7,118 Approved · invoiced
DDR-24116 10 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2616 76.2 → 111 34.8 11 / 0 $6,539 Approved · invoiced
DDR-24117 10 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2616 111 → 138.1 27.1 10 / 1.5 $5,436 Approved · invoiced
DDR-24115 10 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 259 → 305 46.0 11 / 0 $8,594 Approved · invoiced
DDR-24110 9 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2616 0 → 28.2 28.2 11 / 0 $5,377 Approved · invoiced
DDR-24111 9 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2616 28.2 → 76.2 48.0 11 / 0 $8,956 Approved · invoiced
DDR-24109 9 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 220.5 → 259 38.5 8.5 / 2.5 $8,120 Approved · invoiced
DDR-24104 8 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2614 314.7 → 353.7 39.0 11.5 / 0 $8,085 Approved · invoiced
DDR-24105 8 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2614 353.7 → 383 29.3 11.5 / 0 $6,339 Approved · invoiced
DDR-24103 8 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 169.9 → 220.5 50.6 11.5 / 0 $9,015 Approved · invoiced
DDR-24098 7 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2614 218.4 → 257.9 39.5 11.5 / 0 $7,304 Approved · invoiced
DDR-24099 7 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2614 257.9 → 314.7 56.8 11.5 / 0 $10,805 Approved · invoiced
DDR-24097 7 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 144.9 → 169.9 25.0 8 / 3 $5,848 Approved · invoiced
DDR-24093 6 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2614 143.7 → 172.7 29.0 11.5 / 0 $5,377 Approved · invoiced
DDR-24094 6 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2614 172.7 → 218.4 45.7 11 / 0 $8,422 Approved · invoiced
DDR-24092 6 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 96.9 → 144.9 48.0 11 / 0 $8,542 Approved · invoiced
DDR-24089 5 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2614 55.2 → 103.1 47.9 11.5 / 0 $8,525 Approved · invoiced
DDR-24090 5 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2614 103.1 → 143.7 40.6 9.5 / 1.5 $8,181 Approved · invoiced
DDR-24088 5 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 63.7 → 96.9 33.2 11 / 0 $6,332 Approved · invoiced
DDR-24084 4 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2612 326.2 → 339 12.8 11.5 / 0 $2,794 Approved · invoiced
DDR-24085 4 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2614 0 → 55.2 55.2 11.5 / 0 $10,246 Approved · invoiced
DDR-24083 4 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 35.3 → 63.7 28.4 11 / 0 $5,067 Approved · invoiced
DDR-24079 3 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2612 260.9 → 295.5 34.6 11.5 / 0 $6,504 Approved · invoiced
DDR-24080 3 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2612 295.5 → 326.2 30.7 11.5 / 0 $6,436 Approved · invoiced
DDR-24078 3 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2613 0 → 35.3 35.3 11 / 0 $6,487 Approved · invoiced
DDR-24074 2 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2612 180.3 → 232.4 52.1 11.5 / 0 $9,273 Approved · invoiced
DDR-24075 2 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2612 232.4 → 260.9 28.5 11 / 0 $5,084 Approved · invoiced
DDR-24073 2 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 312.5 → 331 18.5 11.5 / 0 $4,101 Approved · invoiced
DDR-24069 1 Sep day R204 KP-26-031 BHP Mt Arthur Coal MTA2612 115.6 → 147.8 32.2 11 / 0 $5,746 Approved · invoiced
DDR-24070 1 Sep night R204 KP-26-031 BHP Mt Arthur Coal MTA2612 147.8 → 180.3 32.5 9 / 2.5 $6,786 Approved · invoiced
DDR-24068 1 Sep day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 272.7 → 312.5 39.8 11.5 / 0 $7,794 Approved · invoiced
DDR-24064 31 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2612 53.6 → 85.1 31.5 11 / 0 $5,600 Approved · invoiced
DDR-24065 31 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2612 85.1 → 115.6 30.5 8.5 / 2.5 $6,692 Approved · invoiced
DDR-24063 31 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 226.7 → 272.7 46.0 11 / 0 $8,612 Approved · invoiced
DDR-24061 30 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 362.9 → 397 34.1 11.5 / 0 $7,237 Approved · invoiced
DDR-24062 30 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2612 0 → 53.6 53.6 11.5 / 0 $9,807 Approved · invoiced
DDR-24060 30 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 190.6 → 226.7 36.1 11.5 / 0 $6,788 Approved · invoiced
DDR-24058 29 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 295.3 → 332.2 36.9 11.5 / 0 $7,768 Approved · invoiced
DDR-24059 29 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2610 332.2 → 362.9 30.7 11 / 0 $6,475 Approved · invoiced
DDR-24057 29 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 140.7 → 190.6 49.9 11.5 / 0 $9,102 Approved · invoiced
DDR-24055 28 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 242.7 → 275.1 32.4 11.5 / 0 $5,988 Approved · invoiced
DDR-24056 28 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2610 275.1 → 295.3 20.2 7.5 / 4 $5,529 Approved · invoiced
DDR-24054 28 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 108.6 → 140.7 32.1 11.5 / 0 $5,729 Approved · invoiced
DDR-24052 27 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 147 → 194.5 47.5 11 / 0 $8,732 Approved · invoiced
DDR-24053 27 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2610 194.5 → 242.7 48.2 11.5 / 0 $8,990 Approved · invoiced
DDR-24051 27 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 65 → 108.6 43.6 11.5 / 0 $8,104 Approved · invoiced
DDR-24049 26 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 63 → 119.7 56.7 11.5 / 0 $10,366 Approved · invoiced
DDR-24050 26 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2610 119.7 → 147 27.3 11 / 0 $4,878 Approved · invoiced
DDR-24048 26 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 11.3 → 65 53.7 11.5 / 0 $9,893 Approved · invoiced
DDR-24046 25 Aug day R204 KP-26-031 BHP Mt Arthur Coal MTA2610 0 → 27.1 27.1 5.5 / 0 $7,699 Approved · invoiced
DDR-24047 25 Aug night R204 KP-26-031 BHP Mt Arthur Coal MTA2610 27.1 → 63 35.9 8.5 / 2.5 $7,715 Approved · invoiced
DDR-24045 25 Aug day R205 KP-26-031 BHP Mt Arthur Coal MTA2611 0 → 11.3 11.3 3.5 / 2 $5,392 Approved · invoiced