← TendersPricing
Price build-upfrom the schedule of rates — edit any line
| Code | Description | Qty | Unit | Rate | Amount | Margin | |
|---|---|---|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 | lump | $24,500.00 | $24,500.00 | 42% | |
| DRL-LD311 | Large diameter 311 mm | 600 | m | $420.00 | $252,000.00 | 34% | |
| STBY | Standby — rig & crew | 24 | hr | $420.00 | $10,080.00 | 45% | |
| MOVE | Rig move between holes | 20 | hr | $430.00 | $8,600.00 | 45% | |
- Client
- Malabar Resources
- Site
- Maxwell Underground — Woodlands Hill
- Attention
- Sophie Turnbull
- Method
- Large diameter 311 mm
- Scope
- 4 holes · 600 m · ~16 rig shifts
- Rig
- R213
- Source
- Repeat client
- Due
- 16 Oct 2026
- Prepared by
- Matt Rourke
Subtotal (ex GST)$295,180.00 GST$29,518.00 Total inc GST$324,698.00 All-in per metre$491.97
Estimated margin 35.4% $104,386
Kerembla Pty Ltd
6-8 Carramere Rd, Muswellbrook NSW 2333 · 0400 703 805 · info@kerembla.com.au
ABN 48 137 960 215
Quotation
KQ-26-137
Date 02 Oct 2026
Valid until 01 Dec 2026
Prepared by Matt Rourke
Quotation to
Malabar Resources
Attn: Sophie Turnbull
Site: Maxwell Underground — Woodlands Hill
Edderton Rd, Muswellbrook NSW 2333
ABN 17 139 289 874
Large diameter 311 mm · 4 holes · 600 m
Concrete & ballast drop holes — stage 2Proposed start 07 Dec 2026
| Item | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 lump | $24,500.00 | $24,500.00 |
| DRL-LD311 | Large diameter 311 mm | 600 m | $420.00 | $252,000.00 |
| STBY | Standby — rig & crew | 24 hr | $420.00 | $10,080.00 |
| MOVE | Rig move between holes | 20 hr | $430.00 | $8,600.00 |
| Subtotal (ex GST) | $295,180.00 |
| GST 10% | $29,518.00 |
| Total (inc GST) | $324,698.00 |
Rates are ex GST and valid for 60 days. Standby is charged when the rig and crew are on site and unable to drill for reasons outside Kerembla's control. Mobilisation and demobilisation are charged once per program. Consumables used in bore construction are charged at the listed rates. All work is carried out under Kerembla's Safety Management System and the site's principal hazard management plans.
Mineral exploration & water drilling · Large diameter drilling · Support services · Equipment dry hire