← TendersLost
Lost — Price — awarded on a lower schedule of rates
Price build-upfrom the schedule of rates — edit any line
| Code | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-RC | Mobilise & demobilise — RC rig | 1 lump | $18,000.00 | $18,000.00 |
| DRL-RC | RC 5½" face-sampling hammer | 3,600 m | $94.00 | $338,400.00 |
| STBY | Standby — rig & crew | 40 hr | $420.00 | $16,800.00 |
| MOVE | Rig move between holes | 60 hr | $430.00 | $25,800.00 |
- Client
- Glencore Coal Assets Australia
- Site
- Mangoola Coal
- Attention
- Andrew Kempe
- Method
- RC
- Scope
- 24 holes · 3,600 m · ~26 rig shifts
- Rig
- R218
- Source
- Tender portal
- Due
- 08 Aug 2026
- Prepared by
- Matt Rourke
Subtotal (ex GST)$399,000.00 GST$39,900.00 Total inc GST$438,900.00 All-in per metre$110.83
Estimated margin 35.5% $141,626
Kerembla Pty Ltd
6-8 Carramere Rd, Muswellbrook NSW 2333 · 0400 703 805 · info@kerembla.com.au
ABN 48 137 960 215
Quotation
KQ-26-121
Date 21 Jul 2026
Valid until 19 Sep 2026
Prepared by Matt Rourke
Quotation to
Glencore Coal Assets Australia
Attn: Andrew Kempe
Site: Mangoola Coal
Level 4, 30 Hunter St, Newcastle NSW 2300
ABN 84 655 715 949
RC · 24 holes · 3,600 m
Exploration RC — Mangoola westProposed start 07 Sep 2026
| Item | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-RC | Mobilise & demobilise — RC rig | 1 lump | $18,000.00 | $18,000.00 |
| DRL-RC | RC 5½" face-sampling hammer | 3,600 m | $94.00 | $338,400.00 |
| STBY | Standby — rig & crew | 40 hr | $420.00 | $16,800.00 |
| MOVE | Rig move between holes | 60 hr | $430.00 | $25,800.00 |
| Subtotal (ex GST) | $399,000.00 |
| GST 10% | $39,900.00 |
| Total (inc GST) | $438,900.00 |
Rates are ex GST and valid for 60 days. Standby is charged when the rig and crew are on site and unable to drill for reasons outside Kerembla's control. Mobilisation and demobilisation are charged once per program. Consumables used in bore construction are charged at the listed rates. All work is carried out under Kerembla's Safety Management System and the site's principal hazard management plans.
Mineral exploration & water drilling · Large diameter drilling · Support services · Equipment dry hire