← TendersLost
Lost — Client deferred to FY27 budget
Price build-upfrom the schedule of rates — edit any line
| Code | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-CORE | Mobilise & demobilise — core rig | 1 lump | $16,500.00 | $16,500.00 |
| DRL-HQ | HQ3 wireline core 0–300 m | 480 m | $205.00 | $98,400.00 |
| STBY | Standby — rig & crew | 24 hr | $420.00 | $10,080.00 |
| MOVE | Rig move between holes | 18 hr | $430.00 | $7,740.00 |
| CT-HQ | Core trays — HQ | 110 ea | $26.00 | $2,860.00 |
- Client
- Yancoal Australia
- Site
- Ashton Coal
- Attention
- Priya Nair
- Method
- HQ3 core
- Scope
- 3 holes · 480 m · ~12 rig shifts
- Rig
- R201
- Source
- Repeat client
- Due
- 01 Sep 2026
- Prepared by
- Matt Rourke
Subtotal (ex GST)$135,580.00 GST$13,558.00 Total inc GST$149,138.00 All-in per metre$282.46
Estimated margin 36.5% $49,440
Kerembla Pty Ltd
6-8 Carramere Rd, Muswellbrook NSW 2333 · 0400 703 805 · info@kerembla.com.au
ABN 48 137 960 215
Quotation
KQ-26-125
Date 18 Aug 2026
Valid until 17 Oct 2026
Prepared by Matt Rourke
Quotation to
Yancoal Australia
Attn: Priya Nair
Site: Ashton Coal
Ulan Rd, Ulan NSW 2850
ABN 32 483 573 924
HQ3 core · 3 holes · 480 m
Overcore & strata testing — stage 2Proposed start 05 Oct 2026
| Item | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-CORE | Mobilise & demobilise — core rig | 1 lump | $16,500.00 | $16,500.00 |
| DRL-HQ | HQ3 wireline core 0–300 m | 480 m | $205.00 | $98,400.00 |
| STBY | Standby — rig & crew | 24 hr | $420.00 | $10,080.00 |
| MOVE | Rig move between holes | 18 hr | $430.00 | $7,740.00 |
| CT-HQ | Core trays — HQ | 110 ea | $26.00 | $2,860.00 |
| Subtotal (ex GST) | $135,580.00 |
| GST 10% | $13,558.00 |
| Total (inc GST) | $149,138.00 |
Rates are ex GST and valid for 60 days. Standby is charged when the rig and crew are on site and unable to drill for reasons outside Kerembla's control. Mobilisation and demobilisation are charged once per program. Consumables used in bore construction are charged at the listed rates. All work is carried out under Kerembla's Safety Management System and the site's principal hazard management plans.
Mineral exploration & water drilling · Large diameter drilling · Support services · Equipment dry hire