Price build-upfrom the schedule of rates — edit any line
| Code | Description | Qty | Unit | Rate | Amount | Margin | |
|---|---|---|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 | lump | $24,500.00 | $24,500.00 | 42% | |
| DRL-LD216 | Large diameter 216 mm PDC | 2,100 | m | $289.00 | $606,900.00 | 34% | |
| STBY | Standby — rig & crew | 90 | hr | $460.00 | $41,400.00 | 45% | |
| MOVE | Rig move between holes | 60 | hr | $430.00 | $25,800.00 | 45% | |
| WATER | Water cartage | 180 | hr | $138.00 | $24,840.00 | 48% | |
| CAMP | Accommodation & meals | 540 | person-night | $165.00 | $89,100.00 | 27% | |
- Client
- Glencore Coal Assets Australia
- Site
- Ulan Coal — Ulan West
- Attention
- Andrew Kempe
- Method
- Large diameter 216 mm
- Scope
- 5 holes · 2,100 m · ~42 rig shifts
- Rig
- R212
- Source
- Tender portal
- Due
- 10 Oct 2026
- Prepared by
- Matt Rourke
Subtotal (ex GST)$812,540.00 GST$81,254.00 Total inc GST$893,794.00 All-in per metre$386.92
Estimated margin 34.8% $283,066
Kerembla Pty Ltd
6-8 Carramere Rd, Muswellbrook NSW 2333 · 0400 703 805 · info@kerembla.com.au
ABN 48 137 960 215
Quotation
KQ-26-134
Date 22 Sep 2026
Valid until 21 Nov 2026
Prepared by Matt Rourke
Quotation to
Glencore Coal Assets Australia
Attn: Andrew Kempe
Site: Ulan Coal — Ulan West
Level 4, 30 Hunter St, Newcastle NSW 2300
ABN 84 655 715 949
Large diameter 216 mm · 5 holes · 2,100 m
Surface to inseam gas drainage — Ulan West LW8Proposed start 18 Jan 2027
| Item | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 lump | $24,500.00 | $24,500.00 |
| DRL-LD216 | Large diameter 216 mm PDC | 2,100 m | $289.00 | $606,900.00 |
| STBY | Standby — rig & crew | 90 hr | $460.00 | $41,400.00 |
| MOVE | Rig move between holes | 60 hr | $430.00 | $25,800.00 |
| WATER | Water cartage | 180 hr | $138.00 | $24,840.00 |
| CAMP | Accommodation & meals | 540 person-night | $165.00 | $89,100.00 |
| Subtotal (ex GST) | $812,540.00 |
| GST 10% | $81,254.00 |
| Total (inc GST) | $893,794.00 |
Rates are ex GST and valid for 60 days. Standby is charged when the rig and crew are on site and unable to drill for reasons outside Kerembla's control. Mobilisation and demobilisation are charged once per program. Consumables used in bore construction are charged at the listed rates. All work is carried out under Kerembla's Safety Management System and the site's principal hazard management plans.