Price build-upfrom the schedule of rates — edit any line
| Code | Description | Qty | Unit | Rate | Amount | Margin | |
|---|---|---|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 | lump | $24,500.00 | $24,500.00 | 42% | |
| DRL-LD311 | Large diameter 311 mm | 1,740 | m | $385.00 | $669,900.00 | 34% | |
| STBY | Standby — rig & crew | 70 | hr | $420.00 | $29,400.00 | 45% | |
| MOVE | Rig move between holes | 54 | hr | $430.00 | $23,220.00 | 45% | |
| WATER | Water cartage | 120 | hr | $138.00 | $16,560.00 | 48% | |
- Client
- Peabody Energy Australia
- Site
- Wambo Coal — South Bates
- Attention
- Glen Hutchins
- Method
- Large diameter 311 mm
- Scope
- 6 holes · 1,740 m · ~47 rig shifts
- Rig
- R213
- Source
- Repeat client
- Due
- 14 Oct 2026
- Prepared by
- Matt Rourke
Subtotal (ex GST)$763,580.00 GST$76,358.00 Total inc GST$839,938.00 All-in per metre$438.84
Estimated margin 35.3% $269,665
Kerembla Pty Ltd
6-8 Carramere Rd, Muswellbrook NSW 2333 · 0400 703 805 · info@kerembla.com.au
ABN 48 137 960 215
Quotation
KQ-26-136
Date 29 Sep 2026
Valid until 28 Nov 2026
Prepared by Matt Rourke
Quotation to
Peabody Energy Australia
Attn: Glen Hutchins
Site: Wambo Coal — South Bates
Wambo Rd, Warkworth NSW 2330
ABN 69 311 431 899
Large diameter 311 mm · 6 holes · 1,740 m
Goaf drainage holes — LW 22–24 stage 2Proposed start 16 Nov 2026
| Item | Description | Qty | Rate | Amount |
|---|---|---|---|---|
| MOB-LD | Mobilise & demobilise — large diameter rig | 1 lump | $24,500.00 | $24,500.00 |
| DRL-LD311 | Large diameter 311 mm | 1,740 m | $385.00 | $669,900.00 |
| STBY | Standby — rig & crew | 70 hr | $420.00 | $29,400.00 |
| MOVE | Rig move between holes | 54 hr | $430.00 | $23,220.00 |
| WATER | Water cartage | 120 hr | $138.00 | $16,560.00 |
| Subtotal (ex GST) | $763,580.00 |
| GST 10% | $76,358.00 |
| Total (inc GST) | $839,938.00 |
Rates are ex GST and valid for 60 days. Standby is charged when the rig and crew are on site and unable to drill for reasons outside Kerembla's control. Mobilisation and demobilisation are charged once per program. Consumables used in bore construction are charged at the listed rates. All work is carried out under Kerembla's Safety Management System and the site's principal hazard management plans.