R210 · 07 Oct 2026 day shift · KP-26-041 Alkane Resources
Xero · synced 09:14 Demo 09 Oct 2026
← Drill reports KP-26-041
ShiftTomingley Gold Operations
Rig
R210 Schramm T685WS
Hole
TGW004 · 250 mm
Depth
128.1 → 150 m · 21.9 m
Hours
Drilling 11.5 · standby 0 · rig move 0 · maintenance 0.5
Submitted
07 Oct 2026 · 18:10
Client sign-off
Kate O'Sullivan
Notes
TGW004 completed at 150 m.
Consumablesdrawn from Orange
ItemQtyCost
MUD-BENT Bentonite 25 kg2 bag$48.00
MUD-PAC PAC-L polymer 25 kg3 bag$288.00
MUD-SODA Soda ash 25 kg1 bag$38.00
FUEL Diesel — bulk496 L$833.28
CAS-STL 200 mm steel casing90 m$5,580.00
GRAVEL Gravel pack 20 kg32 bag$448.00
GROUT Cement GP 20 kg40 bag$440.00
Billing at the schedule of rates$17,595.00
CodeDescriptionQtyRateAmount
DRL-WBRotary — 250 mm water bore21.9 m$210.00$4,599.00
CAS-STL200 mm steel casing90 m$118.00$10,620.00
GRAVELGravel pack32 bag$38.00$1,216.00
GROUTCement grout40 bag$29.00$1,160.00
Crew
Tyson Reid
Driller · 8 ord + 4 OT · 0.5 travel · camp
12 h
Callum Reeve
Offsider · 8 ord + 4 OT · 0.5 travel · camp
12 h
Shift economics
Value at contract rates$17,595.00 Crew, rig hours & consumables$11,553.78 Shift margin$6,041.22 · 34.3%